E.J. O’DONOVAN
& Associates
OAKY CREEK OVERLAND CONVEYOR
CLIENT MIM Holdings
MATERIAL COAL
DESIGN TONNAGE 2000tph
LENGTH 2260m
INSTALLED POWER 3x185kW
SYSTEM Overland conveyor to transport material from a new underground mine to an existing washing and rail load-out facility.
SPECIAL FEATURES Two very tight horizontal curves allowing the conveyor to be installed on an existing haul road and make use of two creek crossings, resulting in considerable capital savings.
INVOLVEMENT System Design.    Drive Location and Selection.  
Take-up Performance Requirement.     Static and Dynamic Analysis.
Horizontal Curve Analysis.     Control System Definition.
Component Load Specification.    On-Site Commissioning.